Kent extension costs in 2026, what you'll actually pay
Cost-per-m² by extension type, the hidden cost categories, and why design-and-build beats architect-plus-separate-builder on price predictability.
Real Kent extension prices in 2026
House extension costs in Kent vary significantly by type, size, specification, and location. The headline numbers:
- Single-storey rear extension (15 to 25m²): £45,000 to £85,000
- Single-storey rear extension (25 to 40m²): £75,000 to £140,000
- Double-storey rear extension: £80,000 to £160,000+
- Side return extension: £35,000 to £70,000
- Wrap-around (rear + side return): £90,000 to £170,000+
These are fully finished costs, not shell costs, not structure-only. Fully finished means plastered, decorated, floored, kitchens and bathrooms fitted where applicable, and signed off by building control.
The cost-per-m² breakdown
The most common benchmark used in Kent is cost per square metre of new floor space:
- Budget specification (no wet rooms, standard kitchen): £2,200 to £2,800/m²
- Standard specification: £2,800 to £3,600/m²
- High specification (bifolds, underfloor heating, premium kitchen): £3,600 to £5,000+/m²
The range is wide because the specification drives the price more than the size beyond a certain point. A 20m² kitchen-diner with bifold doors and underfloor heating will cost more than a 25m² basic utility extension.
What's in a good extension quote
A properly detailed extension quote should include:
Site preparation: Groundwork, foundations, drainage connections. Usually 15 to 20% of total project cost.
Structure: Block and beam, timber frame, or cavity wall depending on the specification. Roof structure. Brickwork to match existing.
Weathertight: Roof covering, windows, doors, and external doors.
First fix: Electrical first fix, plumbing first fix.
Insulation and air tightness: To current Part L requirements.
Plastering and boarding.
Second fix: Electrics, plumbing, heating.
Finishing: Floor coverings, decoration, joinery.
Professional fees: Building regulations, structural engineer, planning (if required).
If any category is missing from the quote, ask where it's been costed. Unitemised quotes frequently exclude groundwork or professional fees.
Why extensions cost more than builders' estimates
Three common reasons Kent extension projects run over budget:
Unexpected groundwork: Old drainage, made ground, inadequate bearing capacity, or proximity to trees can add £5,000 to £25,000 to the groundwork phase.
Party wall issues: Work close to a boundary may require party wall procedures. Surveyor fees for both parties can add £2,000 to £6,000.
Specification creep: The kitchen gets upgraded, the bifolds become triple-track, the underfloor heating gets extended. Design-and-build with a fixed specification protects against this.
Design-and-build: the case for one team
When a homeowner hires an architect separately from a contractor, they're managing two sets of professionals whose interests don't always align. The architect specifies; the contractor builds and may suggest changes to the specification. The homeowner manages the interface.
With a design-and-build approach, the design is done in-house, the quote is fixed on an agreed specification, and any changes go through one change control process. For most residential extensions in Kent, this is the better-value route.
Getting your extension quoted
Use our 4-step form to start. We'll survey the site, assess what's structurally and planning-wise achievable, and produce a fully itemised quote. Fixed price, no scope creep.
Ready to take the next step? Visit our house extensions service page to learn more about the process and book your free survey.
Common questions
- How much does a single-storey extension cost in Kent?
- £45,000 to £140,000 depending on size and specification. A typical 20 to 25m² kitchen-diner extension runs £55,000 to £90,000 fully finished.
- Do I need planning permission for an extension?
- Not always. Single-storey rear extensions within certain dimensions fall within permitted development. Conservation areas and double-storey additions usually need planning. We advise at the survey.
- How long does an extension take to build?
- Single-storey: 12 to 20 weeks. Double-storey: 20 to 32 weeks. Timelines depend on groundwork conditions and specification complexity.
- What adds value more, extension or loft conversion?
- Both add significant value. Extensions add more gross floor space but cost more per m². Loft conversions convert existing volume and typically offer better ROI. It depends on the property.